Please ensure Javascript is enabled for purposes of website accessibility

Call us today at (716) 807-8271

About

Dennis Group hired Tedesco Construction to build the wastewater treatment building for the new Great Lakes Cheese facility in Franklinville, NY. 

Bar joists were used as the roof supports to handle the heavy loads inside the building. Due to the corrosive environment, all framing was hot-dip galvanized. The building envelope incorporates energy-efficient and durable insulated roof and wall panels.