Current Projects

2. New York Power Authority

New York Power Authority
100 Katherine Street
Buffalo, NY 14210

New Ice Boom Storage Building Project Phase 2

General Contractor
Edbauer Construction (Bill Bauer)
4408 Milestrip Rd.
Blasdell, NY 14219

Steel Erection: Scanlon Erectors

New Varco Pruden Pre-Engineered Metal Building

Work Shop 82'-4" x 102'-4" x 26'-8"
Crew Facility 82'-4" x 102'-4" x 14'-0"
Hipped Roof condition with various slopes

Roof System: 22 gauge SLR Architectural Roof
Wall System: 4" Thermal Clad (Metl-Span CF) 42" Insulated Wall Panel System
1'-0 Canopy overhang with soffit on all perimeters

Insulation: Sag & Bag Systems (R-30) Work Shop & (R-25) in Crew Facility

Work Shop
(1) 10 ton overhead crane runway including capacity and crane beams
(1) 7 ton overhead crane runway including capacity and crane beams
(1) 2 ton monorail on underside of mezzanine
1,700 square foot Mezzanine including columns, beams and decking.

(4) Walk door canopies
(3) Roof curbs

8-25-10
8-26-10
8-27-10 1
8-27-10 2
8-30-10 1
8-30-10 2
8-30-10 3
8-30-10 4
8-30-10 5
607 Briarwood Lane, Lewiston, NY 14092 - Phone: (716) 807-8271 - Fax: (716) 754-1050
Email: Jeff@Tedescoconstruction.com
Design by MikeLStudios | Built by Sharpcut Media