Current Projects

9. Buffalo Recycling Enterprises, LLC Phase II

Buffalo Recycling Enterprises, LLC Phase II
266 Hopkins Street
Buffalo, NY 14220

New Varco Pruden Pre-Engineered Metal Building
37,400 SF
Area 1- 210'-0 x 100'-0 x 33-6" 1:12 Slope
Area 2- 160'-0 x 100'-0 x 31'-0 1:12 Slope
Panel Rib Srew Down Roofing System
3" (R-10) Fiberglass Insulation for condensation control
(48) 3' x 10' Clear Polycarbonate Skylight Panels
Panel Rib Wall System with cripmed base
All perimeter walls to receive 3' x 7'-6" Clear Polycarbonate Wall Panels

West Expansion off an existing 130' x 200' x 33'-6" Inland Metal Building
200 LF Valley Gutter at Eave Transitions including hot rolled strutural members
12 ga. Galvanized Valley Gutter, Rigid Insulation and EPDM Rubber finishes.

Independent Tipping & Bale Storage Areas with Tube Steel, "I" Beams, Horizontal Framing and 1/2" Plate Steel
August 3rd BRE 2
August 3rd BRE 3
August 3rd BRE 4
August 3rd BRE 5
BRE August 17
BRE August 17 2
BRE August 17 3
BRE August 17 4
BRE July 10 North Endwall
BRE July 10 West Wall
BRE July 14, 2009 Sheeting
BRE July 8th Roofing
BRE July 8th Roofing II
BRE July 8th Wall Sheeting
BRE June 15 1
BRE June 15 2
BRE June 2nd
BRE June 2nd 2
BRE June 2nd 3
July 27 Polycarbonate 1
July 27 Polycarbonate 2
July 27 Polycarbonate 3
July 31st BRE 1
July 31st BRE 2
July 31st BRE 3
June 19th I
June 5th 002
June 5th 003
June 8th 001
June 8th 002
Primary Mains 3
Primary May 27
607 Briarwood Lane, Lewiston, NY 14092 - Phone: (716) 807-8271 - Fax: (716) 754-1050
Email: Jeff@Tedescoconstruction.com
Design by MikeLStudios | Built by Sharpcut Media